Introduction

Specifications

Repairs

Upgrades

To Do List

Knight Rider

 

 


get this gear!

 

 

 

 

REPAIRS:

= New Water Pump
= New Ignition Wire set
= Installed 8 new spark plugs
= Installed new Fuel filter
= New PCV valve
= New Breather
= 2 new rear shocks
= New Front sway bar link kit
= New Rear sway bar link kit
= NewRear brake drum
= New Transmission mount
= New High-pressure power steering hose
= Added Power steering fluid
= New Upper radiator hose
= New Lower radiator hose
= New Hose clamp
= Added Coolant additive
= New Serpentine belt
= Mirror bulb replaced
= Right front side marker bulb replaced
= Rear faded hatch cover restored to black color
= Performed a complete tune up
= BG ATF flush
= Replaced both side window weather strip
s
= New Starter
= New Ignition Lock

= New Relay Guide for the pop-up headlights
= Replaced internal plastic components in pop-up headlight motors
= Installed new hatch hydraulic lifters
= Repaired the Hatch Pull down mechanism: Replaced the plastic housing and the internal gear

= Lubricated door hinges and door locks

 

Body work
Thanks to my friend David Barga, who did a professional work fixing some body damage located on the rear of the car next to the tail lights and on top of each of the rear wheel wells. The car is getting ready to be painted soon!